FUEL LOADING OPTIMIZATION & HAMMERING / PRESSURE
SURGE PREVENTION FOR PETRON LIMAY TERMINAL
Bermad Control Valves - Solved the Hammering Problem on Product
Pumps and Pipings for this project by installing the System called
Bermad 2 Pump System.
The System consists of Bermad Pump Control Valve and Relief Valve
with Bermad Pump Controller
The Loading System was Optimized by managing the activation and
deactivation of 2 pumps according to the present demand at the TTLR.
When the system requires more pressure 2nd Pump shall Automatically
Start to supplement the 1st Pump initially running. During high-pressure
conditions wherein Only Few trucks are Loading, the system shall
shut off one pump leaving only one Pump to supply just enough
pressure for the Loading System. This system Protected the Pumps
and Pipings and Product Meters by eliminating Hammering, Minimized
Power Consumption and Shorten Delivery Time
FUEL
STORAGE TANK FOAM PROTECTION FOR PETRON 12 DEPOTS/TERMINALS NATIONWIDE
Skum Foam Equipment and Bermad Control Valves -
Provided Equipments for the Implementation of Storage Tank Foam Protection
by installing Foam Top Pourer Fire Protection System
On this project, we installed Skum High Back Pressure Foam Generator on
the Foam Inlet Pipeline and Skum Sealing Membrane on the Storage Tank
Inlet. Bermad Hydrant Valve was installed at the Foam Distribution
Manifold to enable Quick Opening of each line and the possibility
to Control each valve Remotely.
The Fuel Storage Tank was protected with the right Proportioning of
Foam to the Storage Tank by providing the suitable equipment from
Skum and the Possibility of Remotely Operating the System by Bermad
Valves. Protecting the Storage tank and the Firefighter too.
TANK
TRUCK LOADING RACK FOAM PROTECTION FOR PETRON MANDAUE TERMINAL, CEBU
CITY
This project currently On - Going is basically a Fire Protection
of the TTLR using Foam by Skum Bladder System and Bermad Electric
Remote Control Valves.
The System supplies
Aspirated Foam Over the Tank truck through the Low Expansion Foam
Sprinklers and Medium Expansion Foam Generators Under the Truck
tires. Proportioning of Foam is by Skum Bladder Tank and Proportioner.
System activation
can be done Electrically through the Electric Remote Control Panel
located at the Dispatching Area or by releasing the Bermad Manual
Emergency Release.
CBK
– OIL FILLED TRANSFORMER SPRINKLER SYSTEM
Bermad Automatic Controlled Deluge Valve was installed for
the protection of Transformers. In the event of fire, the Valve shall
automatically be activated through the Wet Pilot line Detection System.
Pressure Regulating Valves are also installed to Control Pressure
Supply from them Main Source.
CEBU
PACIFIC AIRLINES CORPORATION PASAY AND CEBU MANDAUE DEPOT
Bermad Manual Remote Control Valves and Skum Foam Equipments
were installed for Aviation Fuel Storage Tanks Foam Protection. Enabling
supply Aspirated Foam on the Tank Remotely.
CALTEX
OVERFILL PREVENTION FOR 116 FUEL STORAGE TANKS
Fafnir High Level Alarm System both Optic and Calorimetric
Sensor were installed for diesel ,gasoline and bunker for 13 depots
equipped with sirens .
CALTEX
OVERFILL PREVENTION FOR CALTEX LPG STORAGE TANKS
Three LPG storage of Caltex are equipped with Zone 0 FAFNIR
calorimetric sensor
BERMAD
DIGITAL CONTROL VALVES AF718-03 FOR CALTEX TERMINAL
Most
fuel marker system of Caltex terminal are equipped with Bermad digital
control
valve
CENTRALIZED
FIRE PROTECTION SYSTEM HYDRAULIC OPERATED WITH REMOTE RELEASE
Uni-field supplies and commissioned various de Luge valves
using Bermad 3D model for Pandacan, Apalit and Pasig depots of Caltex
Philippines
PANDACAN
SCALEDOWN PRESSURE RELIEF VALVE FOR FUEL PUMPING STATIONS
Uni-field supplied various sizes of 24 pcs Bermad AF 730
pressure relief valve through contractor JGC Philippines
TOKHEIM/
SATAM POSITIVE DISPLACEMENT METER
SATAM model ZCE5-80 meter with preset are mostly in Caltex
depots located in Davao, Cebu, Poropoint, and Dadiangas
<<